Beyond the Trenches
September 9, 2019
Our new cutting is in the only part of the ringwork’s ditch that remains after excavation in the 80s.
September 6, 2019
Cutting 4 started this summer as a test trench to the depth of the 12th century occupation layer.
September 5, 2019
In Cutting 1, we found a large pocket of charcoal that could be a posthole, but only time will tell!
September 4, 2019
Work in Cutting 3 during the two-week field excavation program from Maynooth University
August 28, 2019
As part of each IAFS course’s academic content, we spend several days at the beginning of most programmes on cultural trips.