September 4, 2014
Entering the final week for the second group of four week students, the recording phase was well under way.
August 20, 2014
This week was spent training on AutoCad on rainy days and cleaning up trenches for photography and drawings.
August 13, 2014
Students undertook an introductory ArcGIS course this week and began to reveal deposits exposed in trenches started last week.
August 11, 2014
Corridor 10 During the last week, the excavation of Corridor 10 was completed and the paved floor was uncovered. The length of the corridor is 25m and it has 7 […]
August 4, 2014
Corridor 10 During the fourth week of excavation at the southern part of Corridor 10 it has almost reached the floor level and gradually advances towards the already excavated part […]
July 24, 2014
Corridor 10 By the end of the third week (4-18/7/2014), most of the southern part of Corridor 10 has been excavated and the investigation has almost reached the already excavated […]
July 21, 2014
We began the first week with our second group of students by explaining the archaeology of Achill Island and touring the sites at Slievemore.
July 17, 2014
Corridor 10 During the second week of the excavation evidence came to light about the crucial role of Corridor 10 in the architecture of the Central Building of Zominthos (fig.1). […]